For contact centers planning across multiple locations, here’s a practical check on whether each site's plan reflects its actual operating conditions. When was the last time you looked at your shrinkage assumption? Not at the network level, but for each site? Most multi-location contact center workforce management runs to a single blended assumption. It's practical. It's faster. And for a long time, it's been accepted as good enough. But good enough at the network level and g